CPSC eFiling is live: the certificate data importers must file at entry
Photo by Christopher Bill on Unsplash
If you import a finished consumer product that needs a General Certificate of Compliance (GCC) or a Children's Product Certificate (CPC), the certificate data must now be filed electronically with US Customs and Border Protection at the time of entry. The requirement took effect on 8 July 2026 under the revised 16 CFR 1110; products entered from a foreign trade zone follow on 8 January 2027. A PDF in a shared drive is not the test. Entry data must resolve to a certifier, a product, the rules applied, and the records behind them.
eFiling is an entry requirement, not a document request
The rule was published at 90 FR 1800 on 8 January 2025. Section 1110.13(a)(1) requires the finished product certifier to eFile the data elements in section 1110.11 at the time of filing the entry, or the entry and entry summary if filed together, through CPSC's PGA Message Set in ACE. A PDF or URL on file does not satisfy the entry requirement.
Domestic manufacturers follow section 1110.13(a)(2): issue the certificate by that date and make it available within 24 hours of a CPSC request. ACE filing targets imports, so a brand that also assembles in the US may have two flows for one product family.
Who is the finished product certifier
Section 1110.7(a) makes the importer the finished product certifier for a product manufactured outside the US, unless a specific rule says otherwise. "Importer" means the importer of record eligible to make entry under the Tariff Act of 1930, and may be an owner, purchaser, or authorized customs broker.
If the IOR is a broker that cannot certify the product, the broker may identify the owner, purchaser, or consignee that authorized entry as the responsible party in the message set. If no message set is filed, CPSC can hold the broker responsible under section 1110.15. Agree in writing who owns the Product Registry account, who signs the attestation, who answers CPSC within 24 hours, and who pays for a hold.
Section 1110.15 covers outsourcing. A certifier may rely on another party to test, enter Product Registry data, or certify under 16 CFR Part 1109. The certifier remains legally responsible for validity, accuracy, completeness, and availability. A supplier uploading data does not transfer liability.
The seven data elements the message set must carry
Section 1110.11(a) requires:
- A unique product identifier — GTIN, model, registered number, serial number, SKU, UPC, or alternate — plus a description matching it to the product.
- Each applicable rule, ban, standard, or regulation, listed separately.
- The certifier's name, street address, email, and telephone.
- The records contact under section 1110.17; a position title only if always staffed and responsive.
- The month, year, and place of manufacture, with the manufacturer's name, address, email, and telephone.
- The most recent date and place of testing, including each third-party laboratory's name, address, email, and telephone.
- The certifier's attestation.
Each certificate must describe a single product; products not the same in all material respects cannot share one. And section 1110.11(a)(2) wants the specific citation. A button-cell certificate citing "CPSIA" instead of 16 CFR Part 1263 gives CPSC's risk model nothing to match. The button cell certificate walkthrough covers the certificate itself.
Two ways to file: Full or Reference
Two routes exist. With the Full PGA Message Set, the importer sends every data element through ACE. With the Reference PGA Message Set, the importer enters the data in CPSC's Product Registry and files a unique reference ID in ACE. The registry accepts single entries, CSV batches, and API uploads; importers can give brokers or labs limited permission to submit.
Both need the data before entry is filed. A common failure is a broker reconstructing the seven fields from a supplier's PDF at 5 p.m. Hand off a data file. CPSC publishes the CATAIR guide, an HTS code flagging list, and importer guidance on its eFiling page.
A Disclaimer Message Set is not required for products outside CPSC jurisdiction, products within jurisdiction but not subject to a certificate rule, or component parts for further manufacturing. CPSC encourages them but does not require them. Let the HTS flagging list, not habit, decide which lines carry certificate data.
Children's products: the CPC chain
A CPC is not a GCC with a different heading. For a children's product, section 14(a)(2) of the Consumer Product Safety Act (15 U.S.C. 2063(a)(2)) requires testing by a third-party conformity assessment body accepted by CPSC; 16 CFR Part 1107 governs that testing. A GCC can rest on a test of each product or a reasonable testing program.
Component testing under 16 CFR Part 1109 can reduce duplication, but the finished product certifier still issues its own certificate. CPSC's children's product certificate guidance is the format reference. The laboratory's identity and acceptance status link the certificate to the test.
De minimis, mail and foreign trade zones
There is no de minimis exemption from the certificate requirement. The final rule requires de minimis shipments of regulated finished products to file CPSC's PGA Message Set through an entry type that can carry it, currently Entry Type 86. Release from manifest does not carry the data. A Section 321 shipment previously waved through on value now needs the same certifier and certificate data as a formal entry.
Mail has a separate path. Because mail shipments have no importer of record, the certifier must enter the data in the Product Registry before arrival under section 1110.13(a)(1). Foreign trade zone entries have until 8 January 2027.
Recordkeeping and the 24-hour test
Section 1110.17 requires the certificate and supporting records for at least five years from the certificate creation date: GCC test results and Part 1109 records, CPC test results and Part 1107 records, and component part records where used. Section 1110.13(b) requires furnishing it to each distributor or retailer; section 1110.13(c) requires it within 24 hours of a CPSC or CBP request.
Design the file around a certificate ID, not a supplier folder. Each ID should resolve to the seven fields, test report, component certificates, manufacturing address, and a recordkeeper. A generic compliance inbox fails the "always staffed and responsive" test in section 1110.11(a)(4). The market-entry guide sets out the wider sequence, and a sample certificate is a useful format check.
What gets a shipment held
CPSC says that, at least initially, it generally will not ask CBP to deny entry solely for missing eFiled data. That is not a safe assumption. Missing or false data raises the shipment's risk score, making examination more likely, and CPSC can still refuse admission under 15 U.S.C. 2066(a)(2) or request seizure.
The errors are mundane: one certificate stretched across materially different SKUs; a rule cited by statute rather than the specific part; a test date that predates a material change; a laboratory not CPSC-accepted for a children's product; a certifier name that does not match the invoice; a records contact who has left. Audit those six before the purchase order, not after the container is on the water.
FAQ
Does eFiling replace the certificate?
No. The certifier still issues the certificate, keeps records for five years, furnishes it to distributors and retailers, and produces it within 24 hours of a request. A PDF alone no longer meets the entry requirement.
Our broker clears customs. Is the broker the certifier?
The importer of record is the finished product certifier under 16 CFR 1110.7(a). If the IOR is an authorized broker, the broker may identify the owner, purchaser, or consignee in the message set, but the certifier remains legally responsible under 16 CFR 1110.15. Put the data obligation in the broker agreement.
Do de minimis shipments need certificate data?
Yes. There is no de minimis exemption. Section 321 shipments of regulated finished products need CPSC's PGA Message Set through an entry type that supports it, currently Entry Type 86. Mail shipments go into the Product Registry before arrival.
We import from a foreign trade zone. Which date applies?
8 January 2027, for products entered for consumption or warehousing from an FTZ. The general effective date was 8 July 2026. Document the entry type and keep the certificate file ready.
Not sure which regulations apply to your product?
Enter your product features once — ComplyMatrix shows the applicable rules across the EU, US, UK, Canada and Australia, with the source text for every conclusion.
Try ComplyMatrix free